This report is issued as part of the Health and Safety Executive's commitment to make information about inspection and regulatory activities relating to the above site available to the public. It is for distribution to members of the GE Healthcare Ltd Grove Centre Local Liaison Committee (LLC) and covers activities associated with the regulation of safety at the site. These reports are distributed quarterly. Site Inspectors of HM Nuclear Installations Inspectorate attend LLC meetings and will be happy to respond to any questions raised there by members. Any other person wishing to inquire about matters covered by this report should contact the HSE’s Nuclear Directorate on 0151-951-4382.
An NII inspection was made on 31 January 2007. (Inspections are also made at GE Healthcare Ltd’s nuclear licensed sites at Amersham (the Grove Centre) and Harwell. Where these are relevant to the Maynard Centre they are included below. For instance, the sites have many arrangements in common for compliance with the conditions attached to their site licences.)
Inspections are undertaken for the purpose of monitoring compliance with (i) the conditions attached by HSE to the nuclear site licences, and (ii) other relevant provisions of the Health and Safety at Work etc Act 1974, including the Ionising Radiations Regulations 1999. In this period routine inspections included:
Issues arising from these and previous inspections are being pursued.
Modifications: NII has written to the licensee requiring it remedy deficiencies in its arrangements for the control of modifications to the plant and processes.
Waste Shelters: The waste shelters house mixed solid waste in mild-steel drums. In accordance with a programme agreed last year, these drums are now being inspected and removed. NII continues to monitor progress.
No statutorily reportable incidents were notified to NII in this quarter.
As part of its regulation under the nuclear site licence NII issues formal regulatory documents, which include Consents, Approvals, Directions, and Licence Instruments [Licence Instruments are issued: to acknowledge receipt of specified documents, eg proposals for a new or modified plant; to stipulate whether the Inspectorate intends to examine these documents; or to agree to the start of a particular phase of construction, commissioning, modification, or decommissioning.] No such documents were issued in this quarter.
No other issues have arisen that have required formal regulatory action.