Asbestos in Schools 'CLASP' Working Group Terms of reference

The work of the ‘Asbestos in CLASP and other System Buildings’ Working Group (AC&SBWG) is in response to new (autumn 2006) information about the potential for asbestos fibre release in CLASP schools built between 1945 and 1980 (see footnote 1).

AC&SBWG will be GB wide and will specifically address the issue of potential asbestos fibre release in CLASP and other similar system built schools (as described in footnote 1). However, any advice provided would be extended to other types of system buildings in the public sector constructed in the above period where the same scenario for potential fibre release exists.

The AC&SBWG will operate as an advisory group and its functions will be to:

The AC&SBWG will produce the following outputs:

Membership of AC&SBWG will be limited to one representative from the following organisations:

Footnote 1

Following some asbestos work at a CLASP school in late July 2006, contractors failed to obtain levels of fibre in air below ‘clearance levels’ when as part of deliberate disturbance procedures they struck parts of the metal casing around columns in the room. The evidence suggested that fibres were spreading from damaged column casing. The method used to count the fibres did not discriminate between asbestos and non-asbestos fibres. Later simulation work in a sealed area indicated that there was potential for exposure to persons in the room if the scale of disturbance was reproduced.

This information was reported to HSE mid September 2006. An investigation into the cause of the fibre release found that there had to be certain specific circumstances for the event to occur:

Footnote 2

HSE circulated an advisory note to Directors of Education/Children’s Services in England, Scotland and Wales and to Governing Bodies of Foundation, Voluntary Aided and Independent schools informing them of the potential for fibre release and requiring them to identify CLASP buildings in their control and take action to seal gaps in the structure through which fibres could escape, to prevent any potential asbestos fibre release.